					Located in the free zone of Tanger Automotive City, the construction project of the DELPHI industrial production unit was delivered in January 2019.
The project was carried out on a 4 hectare site with a constructed area of approximately 18,000 m2 including 14,000 m² of steel structure, 3,000 m² of administrative buildings on 2 levels, and 1,000 m² of technical and outdoor premises.
TECHNICAL SHEET
- Delivery: January 2019
 - Deadline: 10 months
 - Steel: 360 T
 - Concrete: 9000 m3
 - Steel frame: 1200 T